The first (and hopefully last) winterization of Elara…
Fuel topped off and stabilizer added, oil changed, oil filter replaced, antifreeze run through engine, AC and freshwater system.
Sails & canvas removed, and winter cover attached.
All snug for the winter!
Views 3542
Likes 0